Formula 1.125
Time to reach the semi-steady state for a gas well in a circular or square drainage area (1)
Input(s)
$\mu_{\mathrm{gi}}$: Initial Gas Viscosity (cP)
$\emptyset$: Porosity (fraction)
$\mathrm{c}_{\mathrm{ti}}$: Initial Total Compressibility (1/psi)
A: Drainage Area $\left(\mathrm{ft}^{2}\right)$
$\mathrm{k}$: Effective Gas Permeability $(\mathrm{mD})$
Output(s)
$\mathrm{t}_{\mathrm{pss}}$: Time (h)
Formula(s)
$$ \mathrm{t}_{\mathrm{pss}}=\frac{15.8 * \emptyset * \mu_{\mathrm{gi}} * \mathrm{c}_{\mathrm{ti}} * \mathrm{~A}}{\mathrm{k}} $$
Reference(s)
Ahmed, T., McKinney, P.D. 2005. Advanced Reservoir Engineering, Gulf Publishing of Elsevier, Chapter: 3, Page: 194.