Formula 2.157
Number of sacks of cement required for a given length of plug
Input(s)
$\mathrm{L}_{\mathrm{p}}$: Plug Length (ft)
$\mathrm{C}_{\mathrm{c}}$: Casing Capacity $\left(\mathrm{ft}^{3} / \mathrm{ft}\right)$
E: Excess Volume (fraction)
Y: Slurry Yield $\left(\mathrm{ft}^{3} /\right.$ stroke $)$
Output(s)
$\mathrm{N}_{\mathrm{s}}$: Sacks of Cement Required (unitless)
Formula(s)
$$ \mathrm{N}_{\mathrm{s}}=\frac{\mathrm{L}_{\mathrm{p}} * \mathrm{C}_{\mathrm{c}} * \mathrm{E}}{\mathrm{Y}} $$
Reference(s)
Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition, Gulf Professional Publishing, Page: 61.