Formula 2.108
Increase mud density by hematite
Input(s)
$W_{1}$: Initial Mud wt. (ppg)
$W_{2}$: Required mud wt. (ppg)
Output(s)
B: Sacks of Hematite required per $100 \mathrm{bbl}$ (stroke/100bbl)
Formula(s)
$$ B=1680 * \frac{W_{2}-W_{1}}{40-W_{2}} $$
Reference(s)
Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 84.