Fracture gradient

The wellbore pressure, per unit of true vertical depth, at which the formation fractures and starts to take drilling fluid.

It is the practical upper bound on circulating density, reported in psi per foot or as an equivalent mud weight. A leak-off test at the casing shoe is the usual measurement in the open hole just drilled. That test is related to the minimum horizontal stress, but the leak-off pressure is not the same number as the closure stress: it includes the pressure needed to start the fracture, not only to hold it open.

Planning a casing point is the act of keeping pore pressure and this gradient apart by enough mud-weight window to drill the next section. A window that has closed is a casing point whether or not the programme had one there.

Related terms