Formula 2.109
Increase volume by barite
Input(s)
$W_{1}$: Initial Mud wt. (ppg)
$W_{2}$: Required mud wt. (ppg)
Output(s)
V: Volume increase per $100 \mathrm{bbl}(\mathrm{bbl} / 100 \mathrm{bbl})$
Formula(s)
$$ V=100 * \frac{W_{2}-W_{1}}{35-W_{2}} $$
Reference(s)
Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 82.